Skip to content
Service | RMC

Service | RMC

Rocky Mountain Crane Service Logs

Posted on January 26, 2022January 26, 2022 by Chad

Power Supply on Vicario Cranes

After replacing transformer and 50 amp twist locks to crane, need to make sure that 465 volt, single phase is present between L1 and L3 at crane.  This can be checked at the main power switch (IG) and terminals Ar and AR

CategoriesGeneral Maintenance, Vicario 1785 - 73, Vicario 1989 - 78, Vicario 22137 - 85, Vicario 2298 - 78

Leave a Reply Cancel reply

You must be logged in to post a comment.

Post navigation

Previous PostPrevious Err7 message on drive (ATV58)
Next PostNext Crane only moves at slowest speed with all functions

Recent Posts

  • Hup won’t slew after powered off for 10 min
  • LMI screen won’t work. Says needs update
  • Crane code for teach-in
  • Crane will not hoist
  • T85A in Dismantle wouldn’t hoist K944A

Cranes

  • A Team Tech Videos (5)
  • B&B SYSTEMS plasma cutter (1)
  • FM GRU 1589 (4)
  • General Maintenance (124)
  • Grove RT890E (1)
  • Liebherr 81k.1 (26)
  • MR 160 C (4)
  • MR 329 (3)
  • MRH 175 (5)
  • Nelson Axles (2)
  • Potain HD-40A (4)
  • Potain HDT 80 (11)
  • Potain HUP 32/27 (62)
  • Potain HUP 40/30 (70)
  • Potain IGO MA13 (10)
  • Potain IGO MA21 (8)
  • Potain IGO T85A (70)
  • Potain IGO T99 (2)
  • Potain MDT 109 (42)
  • Potain MDT 219 J10 (54)
  • Potain MDT 389 (10)
  • Vicario 1785 – 73 (10)
  • Vicario 1989 – 78 (9)
  • Vicario 22137 – 85 (8)
  • Vicario 2298 – 78 (9)
Proudly powered by WordPress
  • Login
  • A Team Tech Videos
  • General Maintenance
  • Liebherr 81k.1
  • Potain HUP 40/30
  • Potain IGO T85A
  • Potain IGO MA13
  • Vicario 1785 – 73
  • Vicario 1989 – 78
  • Vicario 22137 – 85
  • Vicario 2298 – 78