T85 starts and drives shut off

Slew, Trolley, and hoist drives begin start sequence, then power down. Check incoming power. It is possible L1 of the circuit isn’t there, but the other two legs will be the ones providing 48V and 24V to feed processor and start sequence. It will be backed up by the U100N not being powered.

Leave a Reply