Info from Potain about GREAT HEIGHTS package on hoist

Dusty,

Full hoist rope length including rope to rig the jib and maintain 3 wraps is approximately 310-320m. At 30m of HUH, the crane would need approx 220m of rope in total to work in 4 part. You might, therefore, remove about 100m of rope if you discover that the rope is not reeving properly at the lesser operating mast and HUH height.

How to flash Thumb Drive for CCS

Login into Manitowoc Direct,  E-Tech, Dealer Softs- Tools, Soft-Programme and Download the appropriate ccs version for your crane.

In the CCS Folder add an

auth.txt  file Text Doc. with your CCS password (case sensitive)

Potain 27148 Trolley stopped working Fault FST

Crane stopped working one morning when the operator doing warm up.  Start the crane up and all the drives fire up but trolley immediately goes to FST.

We plugged in the handheld and crane works fine.

Got this from Tomas and he said you should try this if the crane is acting funny and you can’t get figure what it is.

Dusty,

Try this.

Hello Tomas,

We think you have an issue with H335H (green light). This light is connecting on Terminal G-33 (only with remote control ).

Try to disconnect it and work with remote control. Please find in attachment the light part number.

Best regards